HCM - Trung Luong Highway is designed with the speed of 120km/h, strictly following the international standards in highway design. This project is undertaken under the contract No. 4.2 which belonged to the Fourth Package of the project. The contract's value is 50bn VND. The project has completed, and opened to traffic on 3 February 2010. NBB has already arranged settlement and liquidation with the main investor.
|
Scale:
- Bridge designed eternal concrete pre-stressed reinforced concrete & steel of the force.
- Search wish drilling bond nhồi D = 1m, L = 38-42m.
- Structure rhythm rhythm including 25 girders with Super T and BTCT BTCT DUL, each rhythm length L = 40 m.
- Total investment: 50 Billion Dong
Progress:
- Construction completed items under the structure (bond nhồi drilling, swimming place, friendly place, xà caps).
- Construction to complete the surface.
- People in the production and fitting pair of side rail to.
|
|